Bathroom Romsey
January 2nd, 2009
Bathroom Romsey – before
Bathroom Romsey – after
Complete rebuilding of old bathroom
Details:
- removing of old bathroom,
- re-positioning wall,
- changing pipes,
- replacing all fixtures,
- floor and wall tiling,
- the mirror built in
- replacing and installing radiator, toilet, wash basin, bath,
- changing taps,
- plasterboard ceiling,
- painting ceiling,
- installing fixed bath screen etc.
Latest Feedbacks